FPSO Conversion

vlcc

Description

Hazardous Area Inspection campaign for a Malaysian O&G production/EPC company in Singapore on their VLCC conversion project to FPSO which added purpose-built topside facilities to separate, stabilize and dehydrate oil and gas drawn from subsea fields on location in Australia. Major Operator turned to EUTEX to ensure an Internationally recognized Inspection was carried out to meet a rigorous safety case.

Inspection Details

EUTEX carried out a campaign of Inspections which involved the Initial 100% Detailed inspection of all electrical equipment installed within pre-determined Hazardous Areas.

Deliverables Included

  • Provision of a recommendation list of punches detailing the actions required to ensure compliance to AS/NZS 60079-14/17 standards.
  • Provision of a recommendation list of replacement parts(BOM list).
  • Corrective
  • Action/Remediation of all non compliances.
  • Fully Integrated E-capture/RFID system implemented *

Initial Detailed Inspection based on 10,000 tags

Close/Visual Periodic inspection based on 10,000 tags

* E-capture/RFID Savings – EUTEX saw a 25% time saving during initial detailed inspection by using their EUTEX DIGITAL solution at the facility

Industry

LNG operations

Business Challenges
  • H&S Compliance
  • Plant reliability
Keys to Success
  • EUTEX Standard Certification Procedures
  • Competent Certified Inspectors
  • Detailed Project Management
  • Ability to interpret Standards and propose cost effective ALARP solutions.
Results
  • Removal on intolerable Safety Risk
  • Compliance with local & International standards
  • Increase in reliability of plant
  • Cost savings of over 25% by digitization via EUTEX DIGITAL systems.
Standards References
  • AS/NZS 60079-14
  • AS/NZS 60079-17
  • AS/NZS 3000