The Challenge
The $10 billion LNG plant was built by a US-based EPC to National Electrical Code 500. The plant has hazardous locations of approximately 35% across the asset. LNG assets are operated and maintained by a multifunctional work force. The challenge was that the company had no system to maintain & inspect this critical Hazardous Location (HAZLOC).
Solution Details
EUTEX carried out a campaign of Inspections which involved the Initial 100% Detailed inspection of all electrical equipment installed within predetermined Hazardous Locations.
Deliverables included:
- Provision of a recommendation list of punches detailing the actions required to ensure compliance to NEC 500 Code.
- Provision of a recommendation list of replacement parts (BOM list).
- Creation of a complete accurate Hazardous Area Equipment Register (supporting electronic dossier of documentation).
- Provision of NEC 500 Inspection Checklist (ICLTM) – the world’s first digitised system to this code to allow monitoring & planning of periodic risk based Hazardous Area Inspection plans.
- EUTEX ICLTM not only reviews on-site critical area issues and identifies potential hazards but also helps to advise on current and subsequent training needs.
Digitisation Benefits
EUTEX advised client they could complete this project >25% quicker than other parties involved in initial tender, however completed even earlier than expected giving client not only a 30% saving in initiating system but ongoing project periodic inspection savings of 50% (= approx. $360k p.a.)
Project Details
EUTEX carried out the Project utilising over 36,000 man hours – all without any Lost Time Accidents (LTA’s) or Incidents (LTI’s) in full compliance with required Client Procedures along with relevant Country & International Standards.
Initial Detailed Inspection based on 48,000 tags
Close/Visual Periodic inspection based on 16,000 tags
EUTEX carried out the Project utilising over 36,000 man hours – all without any Lost Time Accidents (LTA’s) or Incidents (LTI’s) in full compliance with required Client Procedures along with relevant Country & International Standards
Industry
LNG operations
Business Challenges
- H&S Compliance
- Plant reliability
Keys to Success
- EUTEX Standard Inspections.
Keys to Success
- Competent Certified Inspectors
- Detailed Project Management
- Ability to interpret Standards and propose cost effective.
ALARP Solutions
- Functionality of RFID and software system (ICLTM)
Benefits to Clients
- Immediate removal on intolerable Safety.
International Standards
- Increase in reliability of plant.
- 3 Year periodic Inspection cost saving in excess of 1 million dollars (US).
Guidance Followed
- NEC 500
- API RP 500
- API RP 14F