ATEX Verification Global EPC

epc_og

Description

EUTEX has been supporting one of the largest global EPCs by providing assurance that their projects meet international standards, directives, and equipment specifications in relation to their use within potentially explosive atmospheres. Their project is comprised of seven topside structures, six connecting bridges and six jacket extensions. Our job was to make sure it all meets international standards, directives, and project specifications in relation to their use within potentially explosive atmospheres.

Project Details

EUTEX have been carrying out OEM Vendor Inspections on behalf of this EPC on a series of process & functional safety equipment throughout OEM facilities in USA, Europe, Middle East & Asia.

The Vendor Inspections involve FAT Testing and “Ex” Inspection of the finished installation involving 100% Detailed Inspection of all Electrical & Mechanical equipment installed.

Also read: Calibration Campaign for an Onshore Gas Receiving Facility – Case Study

Benefits to our client

By carrying out an Initial detailed Inspection, we are able to confirm the installation has been installed as per specification laid down in the Project & International Standards being followed:

  1. Has been installed without damage and as per any conditions of use

  2. Has a comprehensive “Ex” dossier to back up full compliance “as built”

  3. Puts the onus on the OEM to rectify any non-conformances at source

  4. Provides assurance to the end user that a 3rd Party verification has been carried out by an IECEx Certified Inspection Service Facility.

Client historical average percentage value of overall project cost for rework without 3rd Party verification.

Client recent average percentage value of overall project cost for rework with 3rd Party verification.

* EUTEX have been engaged on this projects for over 24 months utilizing over 25,000 man hours – all without any Lost Time Accidents (LTA’s) or Incidents (LTI’s) in full compliance with required Client Procedures along with relevant Country & International Standards.

Industry
O&G production
Business Challenges
  • H&S Compliance
  • Plant reliability
Keys to Success
  • EUTEX Standard Certification Procedures
  • Competent Certified Inspectors
  • Detailed Project Management
  • Ability to interpret Standards and propose cost effective ALARP solutions
Results
  • Removal on intolerable Safety Risk
  • Compliance with company & international standards
  • Overall project cost savings of over 20% by reducing re-work
Standards References